Chung-Hua University Repository:
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 8557/14866 (58%)
Visitors : 1417253      Online Users : 1671
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version

    Collection

    Teachers Books [6/15]
    College student research projects [3/14]
    Patents [4/14]
    Books [0/1]
    Research Project [22/54]
    Journal Articles [81/254]
    Seminar Papers [182/589]

    Community Statistics


    Item counts issued in 3 years:0(0.00%)
    Items With Fulltext:298(31.67%)

    Download counts of the item
    Download times greater than 0:298(100.00%)
    Download times greater than 100:277(92.95%)
    Total Bitstream Download Counts:63047(2.53%)

    Last Update: 2024-12-01 09:13

    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed

    Jump to: [Chinese Items]   [0-9]   [ A B C D E F G H I J K L M N O P Q R S T U V W X Y Z ]
    or enter the first few letters:   

    Showing items 26-50 of 941. (38 Page(s) Totally)
    << < 1 2 3 4 5 6 7 8 9 10 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2006 Benchmarking Technological Competitiveness of Precast Construction through Patent Map Analysis 鄭紹材; Cheng, Shao-Tsai
    2006 Benchmarking Technological Competitiveness of Precast Construction through Patent Map Analysis 余文德; Yu, Wen-der
    2012 Best Value or Lowest Bid? A Quantitative Perspective 余文德; Yu, Wen-der
    2013 BIM 未來設施管理的利器 石晉方; Shr, Jin Fang
    2007 The body of knowledge of procurement project management for construction projects 楊智斌; Yang, Jyh-Bin
    2008 BOT 模式執行過程時程落後原因分析 楊智斌; Yang, Jyh-Bin
    2005 BOT與統包專案模式財務模型之分析—以某大學人宿舍為例 余文德; Yu, Wen-der
    2008 BSL-3 實驗室規劃設計及現場施工管理之研究 蕭炎泉; Shiau, Yan-Chyuan
    2012 Case Study on Disaster Prevention and Rescue for Railway Construction Project 蕭炎泉; Shiau, Yan-Chyuan
    2010 Causes of delay in the planning and design phases for construction projects 楊智斌; Yang, Jyh-Bin
    2013 Cleanup Case Study of Waste Printed Circuit Boards on Illegal Dumping Sites 張清榮; Jung, Chang Ching
    2009 Closure to “Hybrid Soft Computing Approach for Mining of Complex construction Databases 余文德; Yu, Wen-der
    2012 Combine BIM to Develop Intelligent Building Fire Prevention Monitoring System 蕭炎泉; Shiau, Yan-Chyuan
    2011 Comparative Study of the Contaminant Removal Efficiencies from Municipal Wastewater by an Aerobic Biofilm System Using Natural Gravels and Recycling Materials as the Contact Media 鄭紹材; Cheng, Shao-Tsai
    2005 Comparison of CPM and CCS Tools to Construction Project 楊智斌; Yang, Jyh-Bin
    2005 Comparison of delay analysis software for construction projects 楊智斌; Yang, Jyh-Bin
    2006 Comparison of the Taipei ”Parcel T-9 Joint Transfer Station” in Taiwan with Transfer Stations Worldwide 石晉方; Shr, Jin Fang
    2005 Comparison of three PCM performance evaluation systems in Taiwan 余文德; Yu, Wen-der
    2007 Comparison of various delay analysis methodologies for construction projects 楊智斌; Yang, Jyh-Bin
    2009 Comparison of windows-based delay analysis methods 楊智斌; Yang, Jyh-Bin
    2008 CONSTRUCTION INFLUENCE INFORMATION MANAGEMENT SYSTEM FOR
    COSTAL ENGINEERING
    蕭炎泉; Shiau, Yan-Chyuan
    2008 Construction Technological Strategy Planning based on Patent Analysis 余文德; Yu, Wen-der
    2013 Construction technology for improving concrete surface quality 鄭紹材; Cheng, Shao-Tsai
    2013 Content-based Text Mining Technique for Retrieval of CAD Documents 余文德; Yu, Wen-der
    2012 Crowd Guidance for Emergency Fire Evacuation Based on Wireless Sensor Networks 鄭紹材; Cheng, Shao-Tsai

    Showing items 26-50 of 941. (38 Page(s) Totally)
    << < 1 2 3 4 5 6 7 8 9 10 > >>
    View [10|25|50] records per page

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback