Chung-Hua University Repository:Item 987654321/35755
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 8557/14866 (58%)
Visitors : 1418196      Online Users : 2570
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://chur.chu.edu.tw/handle/987654321/35755


    Title: Capacity planning with sequential time constraints under various control policies in the back-end of wafer fabrications
    Authors: 杜瑩美
    Tu, Ying Mei
    Contributors: 工業管理學系
    Industrial Management
    Keywords: capacity planning;sequential time constraints;queuing model;simulation;wafer fabrication
    Date: 2010
    Issue Date: 2014-06-27 10:48:24 (UTC+8)
    Abstract: To ensure final product yield, engineers have to set up queue time limits for particular sequential machines
    during wafer processing; we name these as ‘sequential time constraints’ (STCs). This issue can be observed
    at the back-end of the copper interconn
    Appears in Collections:[Industrial Management] Journal Articles

    Files in This Item:

    File Description SizeFormat
    p_m515_0188.pdf26KbAdobe PDF198View/Open


    All items in CHUR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback