Chung-Hua University Repository:Item 987654321/35745
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 8557/14866 (58%)
Visitors : 1404342      Online Users : 1709
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://chur.chu.edu.tw/handle/987654321/35745


    Title: Shop-Floor Control For Batch Operations With Time Constraints In Wafer Fabrication
    Authors: 杜瑩美
    Tu, Ying Mei
    Contributors: 工業管理學系
    Industrial Management
    Keywords: time constraints;wafer fabrications;batch processing;shop floor control;batch size
    Date: 2010
    Issue Date: 2014-06-27 10:47:58 (UTC+8)
    Abstract: In wafer fabrications, engineers will set a queue time limit between particular operations to ensure the final product yield, which is named “time constraint.” Due to the dilemma of increasing machine efficiency or decreasing the queue time of WIP, the is
    Appears in Collections:[Industrial Management] Journal Articles

    Files in This Item:

    File Description SizeFormat
    p_m515_0186.pdf28KbAdobe PDF89View/Open


    All items in CHUR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback