Chung-Hua University Repository:Item 987654321/35473
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 8557/14866 (58%)
造访人次 : 1403730      在线人数 : 2491
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻
    主页登入上传说明关于CHUR管理 到手机版


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: http://chur.chu.edu.tw/handle/987654321/35473


    题名: A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows
    作者: 吳鴻輝
    Wu, Horng-Huei
    贡献者: 工業管理學系
    Industrial Management
    关键词: TOC (theory of constraints);DBR (drum-buffer-rope);Bottleneck scheduling;Drum development method;Bottleneck re-entrant flows
    日期: 2006
    上传时间: 2014-06-27 10:39:45 (UTC+8)
    摘要: Implementing the drum-buffer-rope (DBR) management system effectively
    increases throughput, lowers work in process (WIP), shortens cycle time, and
    improves on-time delivery performance. However, implementing DBR is difficult
    and complex in manufacturing e
    显示于类别:[工業管理學系] 期刊論文

    文件中的档案:

    档案 描述 大小格式浏览次数
    p_m515_0097.pdf27KbAdobe PDF169检视/开启


    在CHUR中所有的数据项都受到原著作权保护.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回馈