This paper is to establish and solve the re-scheduling problems under a flow-shop mixed-line production planning. A case study of the final stage, module manufacturing, of TFT-LCD is provided for illustration of the developed mechanism. In this research, This paper is to establish and solve the re-scheduling problems under a flow-shop mixed-line production planning. A case study of the final stage, module manufacturing, of TFT-LCD is provided for illustration of the developed mechanism. In this research,