Chung-Hua University Repository:Item 987654321/32492
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 8557/14866 (58%)
Visitors : 1406150      Online Users : 1213
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://chur.chu.edu.tw/handle/987654321/32492


    Title: 資訊系統委外開發專案之關鍵因素探討
    Authors: 周菡苹
    Chou, Hanping
    Contributors: 資訊管理學系
    Information Management
    Keywords: 資訊系統委外;德菲法;績效衡量指標
    Information;Outsourcing;Delphi;Performance
    Date: 2012
    Issue Date: 2014-06-27 01:56:05 (UTC+8)
    Abstract: 隨著資訊系統委外的規模不斷成長,委外專案的成功率卻未隨之上升。因此,
    本研究期望由專案管理的角度,將資訊系統委外開發依不同階段進行分割,以獲取
    委外開發各階段的重要變數,藉此探討資訊系統委外開發的失敗因素,期望有助於
    委外專案在預定的預算及時程內完成專案所需的品質。本研究首先採用德菲法獲得
    專家的意見,再針對委外專案的成員進行問卷調查。以專案整體的時程、成本、品
    質作為委外專案的績效衡量指標,藉此探討資訊系統委外開發專案在「規劃階段」、
    「執行階段」及「結案階段」可能發生之問題,以獲得整體專案之時程延宕、
    The number of outsorcing projects of information systems is continuously
    increasing; the success rate, however, does not match with this trend. Therefore, this
    study aims to explore in depth the factors contributed to the failure of outsourced
    information
    Appears in Collections:[Department of Information Management] Journal Articles

    Files in This Item:

    File Description SizeFormat
    p_m321_0107.pdf35KbAdobe PDF141View/Open


    All items in CHUR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback