Chung-Hua University Repository:Item 987654321/27931
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 8557/14866 (58%)
Visitors : 1423019      Online Users : 1280
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    CHUR > College of Management > Industrial Management > Seminar Papers >  Item 987654321/27931


    Please use this identifier to cite or link to this item: http://chur.chu.edu.tw/handle/987654321/27931


    Title: Model for Deciding Project Planning Details to Minimize Cost
    Authors: 魏秋建
    Wei, Chiu-Chi
    Contributors: 工業管理學系
    Industrial Management
    Keywords: 專案規劃詳細度;規劃時間;變更大小;專案成本
    Project planning details;Planning time;Scope of changes;Project cost
    Date: 2011
    Issue Date: 2014-06-26 23:43:32 (UTC+8)
    Abstract: 專案成功的關鍵在完整規劃和落實執行,好的專案規劃可以降低風險,提高專案的執行績效。適當的成本和時程控制,以及極少的專案變更可以提高專案如期完成的機率。
    From a management perspective, the key to a successful project lies in its perfect planning and complete execution. An excellent project plan minimizes the risks and, consequently, results in a smooth project execution. In addition, proper cost and time c
    Appears in Collections:[Industrial Management] Seminar Papers

    Files in This Item:

    File Description SizeFormat
    s_m515_0081.pdf27KbAdobe PDF93View/Open


    All items in CHUR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback