Chung-Hua University Repository:Item 987654321/26429
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 8557/14866 (58%)
Visitors : 1403680      Online Users : 2548
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://chur.chu.edu.tw/handle/987654321/26429


    Title: Solutions of Railway Temporary Tracks and Basic Constructions Between Station Platform and Power Poles – Using Temporary Tracks at Fengyuan Section as Example鐵路臨時軌之月台及電力桿基礎施工處理對策
    Authors: 蕭炎泉
    Shiau, Yan-Chyuan
    Contributors: 營建管理學系
    Construction Management
    Keywords: 鐵路工程;臨時軌;處理對策
    Railway Project;Temporary Track;Remedial Measure
    Date: 2011
    Issue Date: 2014-06-26 20:34:09 (UTC+8)
    Abstract: 鐵路工程一直以來較少為一般營建業者所接觸,又因臨時軌受限既有車站用地有限,為維持鐵路正常之營運,必須在鄰近營運中軌道旁施工,且在既有站場內佈滿不明之使用中纜線,稍有不慎極有可能發生重大事故及造成鐵路營運損失,施工廠商因此必須賠償台鐵損失及事故所造成之處理費用,其中所衍生之施工問題,倘能提早因應及擬定處理對策,在施工過程中亦可減少鐵路事故及災害之發生。
    本文以台中計畫先期工程之豐原段臨時軌工程為例,以鐵路施工常見之月台與電力桿基礎發生之問題進行探討,並提出實際且有效之改善處理對策。
    Abstract—Railway projects are rare to typical contractors in the construction industry. As the deployment and switch of temporary tracks are limited by the available space at the station, the constructors need to both ensure that railway services are not
    Appears in Collections:[Department of Construction Management] Seminar Papers

    Files in This Item:

    File Description SizeFormat
    s_a308_0403.pdf36KbAdobe PDF154View/Open


    All items in CHUR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback