Chung-Hua University Repository:
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 8557/14866 (58%)
造访人次 : 1423124      在线人数 : 1312
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻
    主页登入上传说明关于CHUR管理 到手机版
    其他教師著作 [6/15]
    大專學生研究計畫 [3/14]
    專利 [4/14]
    專書 [0/1]
    專題研究計畫 [22/54]
    期刊論文 [81/254]

    类别统计

    近3年内发表的文件:0(0.00%)
    含全文笔数:182(30.90%)

    文件下载次数统计
    下载大于0次:182(100.00%)
    下载大于100次:182(100.00%)
    全文下载总次数:33082(52.36%)

    最后更新时间: 2024-12-03 09:53


    上传排行

    数据加载中.....

    下载排行

    数据加载中.....

    RSS Feed RSS Feed

    跳至: [中文]   [数字0-9]   [ A B C D E F G H I J K L M N O P Q R S T U V W X Y Z ]
    请输入前几个字:   

    显示项目101-125 / 589. (共24页)
    << < 1 2 3 4 5 6 7 8 9 10 > >>
    每页显示[10|25|50]项目

    日期题名作者
    2008 New Model of Cement Product – Precast Slab Track for THSR (Taiwan High Speed Rail) 蕭炎泉; Shiau, Yan-Chyuan
    2004 Parking Storage Planning and Facility installation in Buildings 石晉方; Shr, Jin Fang
    2005 A PCM performance evaluation system for design/build projects 余文德; Yu, Wen-der
    2004 PCM團隊協助公部門業主遴統包廠商之制度 吳卓夫; Wu, Cho-fu
    2004 PCM執行統包公共工程績效之評估 余文德; Yu, Wen-der
    2004 PCM執行統包公共工程績效評估之研究 余文德; Yu, Wen-der
    2005 PCM績效指標之實例驗證-以統包建築工程為例 余文德; Yu, Wen-der
    2006 PC帷幕牆金屬鐵件防火性能之研究 鄭紹材; Cheng, Shao-Tsai
    2004 PDA營建工地紀錄查詢與管理系統之建立 蕭炎泉; Shiau, Yan-Chyuan
    2005 Performance evaluation of the construction knowledge management system—a case study of an A/E consulting firm 余文德; Yu, Wen-der
    2010 A Pilot Study on the Application of TRIZ to Problem-Solving of Engineering Consultants 余文德; Yu, Wen-der
    2008 Preliminary study on the automatic lessons-learned file generator 余文德; Yu, Wen-der
    2010 Preliminary Study on the Model for Automatic Generation of Innovative Alternatives 鄭紹材; Cheng, Shao-Tsai
    2006 Quantifying Benefits of Knowledge Management System-A Case Study of an Engineering Consulting Firm 余文德; Yu, Wen-der
    2005 Real-Time Decision-Making with Partial Information for Construction Management 余文德; Yu, Wen-der
    2011 Removal of Various Contaminations from Drainage by Using Free Water
    Surface and Submerged Surface Flow Wetland Systems
    楊錫麒; Yang, Hsi-Chi
    2012 Renovation and Maintenance of Theater Dimmer Systems:
    Case Study on the Experimental Theater of the National Drama Theater
    蕭炎泉; Shiau, Yan-Chyuan
    2004 Restoring the Taipei Rapid Transit System Following Typhoon Nali 石晉方; Shr, Jin Fang
    2013 REVITALIZATION of PEUNAYONG AREA AS CENTRAL BUSINESS DITRSICT (CBD) IN ACEH 李少甫; Li, Shaofu
    2013 Saving Courtyards, Saving Energy in Vernacular Shophouses 李少甫; Li, Shaofu
    2008 Simplifying on-site report completion for material management 楊智斌; Yang, Jyh-Bin
    2011 SIMULATION FOR STEEL BRIDGE ERECTION BY USING BIM TOOLS 邱垂德; Chiu, Chui-Te
    2011 Solutions of Railway Temporary Tracks and Basic Constructions Between Station Platform and Power Poles – Using Temporary Tracks at Fengyuan Section as Example鐵路臨時軌之月台及電力桿基礎施工處理對策 蕭炎泉; Shiau, Yan-Chyuan
    2005 Stochastic Delay Analysis for Construction Projects 楊智斌; Yang, Jyh-Bin
    2008 A STUDY ON APPLICATION OF EXPANSION ANCHOR REINFORCEMENT IN
    CONSTRUCTION ENGINEERING
    蕭炎泉; Shiau, Yan-Chyuan

    显示项目101-125 / 589. (共24页)
    << < 1 2 3 4 5 6 7 8 9 10 > >>
    每页显示[10|25|50]项目

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回馈