Chung-Hua University Repository:
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 8557/14866 (58%)
Visitors : 1417504      Online Users : 1907
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version

    Collection

    Teachers Books [6/15]
    College student research projects [3/14]
    Patents [4/14]
    Books [0/1]
    Research Project [22/54]
    Journal Articles [81/254]
    Seminar Papers [182/589]

    Community Statistics


    Item counts issued in 3 years:0(0.00%)
    Items With Fulltext:298(31.67%)

    Download counts of the item
    Download times greater than 0:298(100.00%)
    Download times greater than 100:277(92.95%)
    Total Bitstream Download Counts:63047(2.53%)

    Last Update: 2024-12-01 09:13

    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed

    Jump to: [Chinese Items]   [0-9]   [ A B C D E F G H I J K L M N O P Q R S T U V W X Y Z ]
    or enter the first few letters:   

    Showing items 226-250 of 941. (38 Page(s) Totally)
    << < 5 6 7 8 9 10 11 12 13 14 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2007 Synchronization-based model for improving on-site data collection performance 楊智斌; Yang, Jyh-Bin
    2008 Synthesis and photocatalytic characterization of titania-supported bamboo charcoals by using sol-gel method 吳卓夫; Wu, Cho-fu
    2008 Synthesis and photocatalytic characterization of titania-supported bamboo charcoals by using sol-gel method 石晉方; Shr, Jin Fang
    2006 System requirement analysis of a construction delay analysis system 楊智斌; Yang, Jyh-Bin
    2005 Time-dependent construction social costs model 余文德; Yu, Wen-der
    2012 TRIZ發明原則應用於營建管理之初步研究 鄭紹材; Cheng, Shao-Tsai
    2012 Use BIM to Construct Building Facility Management System 蕭炎泉; Shiau, Yan-Chyuan
    2011 USE BIM TO CONSTRUCT ELECTRONIC RESUME SYSTEM FOR BUILDING PROJECT 蕭炎泉; Shiau, Yan-Chyuan
    2004 Use Object Oriented, Visual Modeling, PDA to Construct Specification Inquiring, Quality Inspection and Site Recording System 蕭炎泉; Shiau, Yan-Chyuan
    2010 USE RFID TO ESTABLISH SITE BUILDING MATERIAL MANAGEMENT SYSTEM 蕭炎泉; Shiau, Yan-Chyuan
    2012 Using Ecotect to Improve Energy Conservation for Older Buildings 蕭炎泉; Shiau, Yan-Chyuan
    2008 Using structural equation modeling to analyze relationships among key causes of delay in construction 楊智斌; Yang, Jyh-Bin
    2004 Utilization of super water-repellent coating based on CNTS 吳卓夫; Wu, Cho-fu
    2006 A VaFALCON neuro-fuzzy system for mining of incomplete construction databases 余文德; Yu, Wen-der
    2004 A VaFALCON NEURO-FUZZY SYSTEM FOR MINING OF INCOMPLETE DATABASES 余文德; Yu, Wen-der
    2012 Visible-Light Photodegradation of Dye on Co-Doped Titania Nanotubes Prepared by Hydrothermal Synthesis 楊錫麒; Yang, Hsi-Chi
    2004 A Web Agent for Conceptual Cost Estimation of Highway Construction Projects 余文德; Yu, Wen-der
    2006 A WICE Approach to Real-time Construction Cost Estimation 余文德; Yu, Wen-der
    2003 WICE: A Web-based Intelligent Cost Estimator for Real-time Decision Support 余文德; Yu, Wen-der
    2010 三芝北投公路交通建設生態補償評估之研究 楊錫麒; Yang, Hsi-Chi
    2005 不同承攬形式對營造廠現金流量影響分析 楊智斌; Yang, Jyh-Bin
    2011 不同類型營建專案排程實務之適用性探討(下) 張清榮; Jung, Chang Ching
    2005 中科后里園區與周邊地區之介面空間因素探討 吳卓夫; Wu, Cho-fu
    2007 中華郵政公共建築工程生命週期管理之探討 石晉方; Shr, Jin Fang
    2004 中部科學工業園區台中基地與周邊地區空間介面整合之探討 楊錫麒; Yang, Hsi-Chi

    Showing items 226-250 of 941. (38 Page(s) Totally)
    << < 5 6 7 8 9 10 11 12 13 14 > >>
    View [10|25|50] records per page

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback