English
|
正體中文
|
简体中文
|
Items with full text/Total items : 8557/14866 (58%)
Visitors : 1417254 Online Users : 1672
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by
NTU Library IR team.
Scope
All of CHUR
College of Architecture and Design
Department of Construction Management
--Teachers Books
--College student research projects
--Patents
--Books
--Research Project
--Journal Articles
--Seminar Papers
Tips:
please add "double quotation mark" for query phrases to get precise results
please goto advance search for comprehansive author search
Adv. Search
Home
‧
Login
‧
Upload
‧
Help
‧
About
‧
Administer
CHUR
>
College of Architecture and Design
>
Department of Construction Management
>
Browse By Title
Browse By Authors
Browse By Date
Browse By Data Type
Community Detail
Introduction:
營建管理學系介紹
Loading...
Collection
Teachers Books
[
6
/15]
College student research projects
[
3
/14]
Patents
[
4
/14]
Books
[
0
/1]
Research Project
[
22
/54]
Journal Articles
[
81
/254]
Seminar Papers
[
182
/589]
Siblings
Bachelor Program of Innovative Design and Management
[
2
/2]
Department of Civil Engineering
[
289
/729]
Department of Industrial Design
[
5
/6]
Department of Architecture and Urban Planning
[
198
/420]
Department of Landscape Architecture
[
105
/282]
營建管理研究所
[
5
/5]
Community Statistics
Item counts issued in 3 years:0(0.00%)
Items With Fulltext:298(31.67%)
Download counts of the item
Download times greater than 0:298(100.00%)
Download times greater than 100:277(92.95%)
Total Bitstream Download Counts:63047(2.53%)
Last Update: 2024-12-01 09:13
Top Upload
Loading...
Top Download
Loading...
Recent Submissions
Study on Precast Slab Track for Tai...
Establishment of the Tour-Site Navi...
數值模擬防火塗料之鋼梁耐火性能之研究
Removal of Various Contaminations f...
Mixed Proportion Design of Lightwei...
國民小學學校建築維護管理委託物業管理之研究
電腦輔助情境式教學對學習成效之研究
校園閒置空間再利用文獻彙整探討-以台灣學校為例
遮斷防護工法選擇之探討
Mixed Proportion Design of Lightwei...
Jump to:
[
Chinese Items
] [
0-9
] [
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
]
or enter the first few letters:
Showing items 201-250 of 941. (19 Page(s) Totally)
<<
<
1
2
3
4
5
6
7
8
9
10
>
>>
View [
10
|
25
|
50
] records per page
Date
Title
Authors
2013
REVITALIZATION of PEUNAYONG AREA AS CENTRAL BUSINESS DITRSICT (CBD) IN ACEH
李少甫
;
Li, Shaofu
2013
Saving Courtyards, Saving Energy in Vernacular Shophouses
李少甫
;
Li, Shaofu
2007
Selection of an ERP System for a construction firm in Taiwan: a case study
楊智斌
;
Yang, Jyh-Bin
2012
The selection of Supplemental Grouting Methods for Disaster Prevention in Rapid Transit Underground Tunnel Excavation
楊錫麒
;
Yang, Hsi-Chi
2012
A Self-Evolutionary Model for Automated Innovation of Construction Technologies
余文德
;
Yu, Wen-der
2012
A Self-Evolutionary Model for Automated Innovation of Construction Technologies
鄭紹材
;
Cheng, Shao-Tsai
2004
Setting Maximum Incentive for Incentive/Disincentive Contracts for Highway Projects
石晉方
;
Shr, Jin Fang
2008
Simplifying on-site report completion for material management
楊智斌
;
Yang, Jyh-Bin
2011
SIMULATION FOR STEEL BRIDGE ERECTION BY USING BIM TOOLS
邱垂德
;
Chiu, Chui-Te
2011
Solutions of Railway Temporary Tracks and Basic Constructions Between Station Platform and Power Poles – Using Temporary Tracks at Fengyuan Section as Example鐵路臨時軌之月台及電力桿基礎施工處理對策
蕭炎泉
;
Shiau, Yan-Chyuan
2005
Stochastic Delay Analysis for Construction Projects
楊智斌
;
Yang, Jyh-Bin
2008
A STUDY ON APPLICATION OF EXPANSION ANCHOR REINFORCEMENT IN
CONSTRUCTION ENGINEERING
蕭炎泉
;
Shiau, Yan-Chyuan
2012
Study on Building Fire Control System
蕭炎泉
;
Shiau, Yan-Chyuan
2011
A Study on Construction Contract Management-The Establishment of Contract Management System
蕭炎泉
;
Shiau, Yan-Chyuan
2012
Study on Disaster Prevention of Site-Support Method for Bridge Construction
蕭炎泉
;
Shiau, Yan-Chyuan
2012
Study on Future and International Competitiveness of Biotechnology Development in Taiwan
蕭炎泉
;
Shiau, Yan-Chyuan
2012
Study on Improving Energy Saving for Old Buildings with Daily Energy Conserving Index
蕭炎泉
;
Shiau, Yan-Chyuan
2012
Study on Precast Slab Track for Taiwan High Speed Rail
蕭炎泉
;
Shiau, Yan-Chyuan
2012
Study on Precast Slab Track for Taiwan High Speed Rail
蕭炎泉
;
Shiau, Yan-Chyuan
2011
A Study on Relaxation Camp Facility Management
蕭炎泉
;
Shiau, Yan-Chyuan
2012
A Study on Sustainable House Design in Lanyu
楊錫麒
;
Yang, Hsi-Chi
2008
A STUDY ON THE ESTABLISHMENT OF A KNOWLEDGE BASE FOR INNOVATIVE BUILDING MATERIALS
蕭炎泉
;
Shiau, Yan-Chyuan
2012
Study on the Land Subsidence Causes and Control Measures for Central and Southern Section of Taiwan High Speed Rail
蕭炎泉
;
Shiau, Yan-Chyuan
2004
SWOT策略分析-以國家藝術村為例
劉福勳
;
Liou, Fwu-shiun
2008
Synchronization-based model and speech-enabled application for on-site data collection improvement
楊智斌
;
Yang, Jyh-Bin
2007
Synchronization-based model for improving on-site data collection performance
楊智斌
;
Yang, Jyh-Bin
2008
Synthesis and photocatalytic characterization of titania-supported bamboo charcoals by using sol-gel method
吳卓夫
;
Wu, Cho-fu
2008
Synthesis and photocatalytic characterization of titania-supported bamboo charcoals by using sol-gel method
石晉方
;
Shr, Jin Fang
2006
System requirement analysis of a construction delay analysis system
楊智斌
;
Yang, Jyh-Bin
2005
Time-dependent construction social costs model
余文德
;
Yu, Wen-der
2012
TRIZ發明原則應用於營建管理之初步研究
鄭紹材
;
Cheng, Shao-Tsai
2012
Use BIM to Construct Building Facility Management System
蕭炎泉
;
Shiau, Yan-Chyuan
2011
USE BIM TO CONSTRUCT ELECTRONIC RESUME SYSTEM FOR BUILDING PROJECT
蕭炎泉
;
Shiau, Yan-Chyuan
2004
Use Object Oriented, Visual Modeling, PDA to Construct Specification Inquiring, Quality Inspection and Site Recording System
蕭炎泉
;
Shiau, Yan-Chyuan
2010
USE RFID TO ESTABLISH SITE BUILDING MATERIAL MANAGEMENT SYSTEM
蕭炎泉
;
Shiau, Yan-Chyuan
2012
Using Ecotect to Improve Energy Conservation for Older Buildings
蕭炎泉
;
Shiau, Yan-Chyuan
2008
Using structural equation modeling to analyze relationships among key causes of delay in construction
楊智斌
;
Yang, Jyh-Bin
2004
Utilization of super water-repellent coating based on CNTS
吳卓夫
;
Wu, Cho-fu
2006
A VaFALCON neuro-fuzzy system for mining of incomplete construction databases
余文德
;
Yu, Wen-der
2004
A VaFALCON NEURO-FUZZY SYSTEM FOR MINING OF INCOMPLETE DATABASES
余文德
;
Yu, Wen-der
2012
Visible-Light Photodegradation of Dye on Co-Doped Titania Nanotubes Prepared by Hydrothermal Synthesis
楊錫麒
;
Yang, Hsi-Chi
2004
A Web Agent for Conceptual Cost Estimation of Highway Construction Projects
余文德
;
Yu, Wen-der
2006
A WICE Approach to Real-time Construction Cost Estimation
余文德
;
Yu, Wen-der
2003
WICE: A Web-based Intelligent Cost Estimator for Real-time Decision Support
余文德
;
Yu, Wen-der
2010
三芝北投公路交通建設生態補償評估之研究
楊錫麒
;
Yang, Hsi-Chi
2005
不同承攬形式對營造廠現金流量影響分析
楊智斌
;
Yang, Jyh-Bin
2011
不同類型營建專案排程實務之適用性探討(下)
張清榮
;
Jung, Chang Ching
2005
中科后里園區與周邊地區之介面空間因素探討
吳卓夫
;
Wu, Cho-fu
2007
中華郵政公共建築工程生命週期管理之探討
石晉方
;
Shr, Jin Fang
2004
中部科學工業園區台中基地與周邊地區空間介面整合之探討
楊錫麒
;
Yang, Hsi-Chi
Showing items 201-250 of 941. (19 Page(s) Totally)
<<
<
1
2
3
4
5
6
7
8
9
10
>
>>
View [
10
|
25
|
50
] records per page
DSpace Software
Copyright © 2002-2004
MIT
&
Hewlett-Packard
/
Enhanced by
NTU Library IR team
Copyright ©
-
Feedback